BOEING AEROSTRUCTURES AUSTRALIA VIC SSTLS Shivakumar Manchanapura Lingaiah

1) Reached the first target in 5S from 2.9 to 3.5 by empowering team members.|2) Identified the need of Bullet pin kits after failing First pass quality & accomplishing 90% results & created | maintenance plan & control.|3) Designed lifting block and further delegated to tooling & project management to develop further,which reduces | defects & increases productivity|4) To provide a safe walk way for pedestrians to prevent trip over projecting Tripod to the walk way – Raised SAS|5) Airline & power line are connected from the sources at a distance of 2m to 4m on the floor & covered with rubber | mat-which led to trip hazard & rolling foot- Raised SAS & they executed work.